Scope of Work Labor ONLY
Property is located on 119th Harvard
We turned a bedroom into a bathroom.
-
Finish getting the walls ready for paint.
-
Paint the walls, door, window trim and baseboards.
-
Install pocket door
-
Install 5 wood shelves in the opening in the wall
-
Install the heated floors
-
Install the tile and pebble flooring in the bathroom
-
finish installing the switches
-
Install the plumbing fixtures
-
Grout the shower and wall
-
Install the vanity, faucet, p-trap, waterline, valves
-
The mirror is a LED Mirror and it will need an outlet install.
-
Install 2 glass shower walls but NO shower door.
-
We may be changing out the window trim.
-
I'm sure I missed something
Bathroom Design Layout
Bathroom Materials


Bathroom Progress Pictures




The flooring of the shower is going to be some click and lock teak flooring at the property. Big rocks will go around the teak flooring creating a spa environment.