Scope of Work Labor ONLY

Canal Street Bathroom

Main Bath: Demo and debris removal from the premises.

 

(SOFFIT OVER THE TUB HAS BEEN REMOVED ALREADY)

Included in Install:
Convert tub into a shower with a bench and shower doors.
Install ceramic tile in the shower to the ceiling with mosaic tile strip

Soap Niche

Install insulation on the exterior wall
shower drain
durock/cement board
Shower faucet with valve kit
Buildout shower floor with membrane, cement and tile shower floor
Waterproof shower

Install drywall, mud, sand and paint the ceiling

Install ceramic tile in the shower with mosaic tile strip

Install a new 30" vanity,P-Trap and water lines
sink faucet and drain
mirror

vanity light

P-Trap, water lines

Install Shower towel rack set or shelving

 

Install new toilet 


Install ceramic tile on floors
GFCI

Paint Bathroom
Install baseboard

Paint the baseboard, door and trim a high gloss white.
 

Bathroom Materials