Scope of Work Labor ONLY
Property is located around 79th California
-
Demo and debris removal of old kitchen cabinets, hardware, countertops and flooring.
-
Remove soffits if possible
-
Install 10 new kitchen (Gray Shaker cabinets) cabinets.
-
Install Backsplash
-
Install new sink,
-
faucet fixtures
-
hardware (Cabinet Nobs)
-
Install new Ceramic Flooring
-
New GFCI outlets installed at the countertops
-
Pluming: P-trap, waterline, baskets and valves.
-
Paint living room, kitchen,
-
Install new 5 1/4 baseboards, door and window trim
-
Install a new pre-hung back door
-
Install 1 circuit breaker to move the microwave to a different breaker to prevent popping.
-
Install garbage disposal
-
Install waterlines for the dishwasher and fridge
-
Need an outlet for the microwave over the stove.
-
Install new double pane window with (aluminum capping if needed)
-
Remove the wall to open the kitchen to the dining room. Install a 48" island with countertop and area for seating in that opening.
-
Install a beam as support the ceiling
-
Install 2 pendant lights at the island
-
Move the electrical and ductwork in the wall.
Kitchen Materials