Scope of Work Labor ONLY
Property is located on the West side of Chicago
-
Demo and Debris removal
-
Install new drywall, mud, tape, sand and paint.
Replace the floor boards -
Install new jetted whirlpool soaker tub and drain
-
Build a knee wall on the left side of the tub
-
We are going to expose the window that is hiding behind the shower and build a knee wall
-
About 3 sheets of drywall will be needed. we are removing all the blue areas.
-
Install insulation on the exterior wall
-
Install durock around tub and floor
-
Waterproof shower with red membrane
-
Install Shower faucet with valve kit
-
Install shower tile around the shower only and floor
-
Install Towel Bar Set
-
The galvanized will be changed out 1 foot above the floor in order to connect copper lines for the shower valve. The shower handle will be upgraded to a single handle valve if needed.
-
Install ceramic tile in the shower with mosaic tile strip
-
Install a new 18" vanity sink, faucet and drain, mirror and vanity light
-
P-Trap, water lines and maybe new valves
-
Install new toilet 2-piece
-
Install GFCI
-
Install a corner shower curtain rod
-
Paint Bathroom
-
Install 5 1/4 baseboard. Paint the baseboard a high gloss white.
-
Install mid grade lighting