Scope of Work Labor ONLY

Property is located on the West side of Chicago
  1. Demo and Debris removal

  2. Install new drywall, mud, tape, sand and paint.
    Replace the floor boards

  3. Install new jetted whirlpool soaker tub and drain

  4. Build a knee wall on the left side of the tub

  5. We are going to expose the window that is hiding behind the shower and build a knee wall

  6. About 3 sheets of drywall will be needed. we are removing all the blue areas.

  7. Install insulation on the exterior wall

  8. Install durock around tub and floor

  9. Waterproof shower with red membrane

  10. Install Shower faucet with valve kit

  11. Install shower tile around the shower only and floor 

  12. Install Towel Bar Set

  13. The galvanized will be changed out 1 foot above the floor in order to connect copper lines for the shower valve. The shower handle will be upgraded to a single handle valve if needed.

  14. Install ceramic tile in the shower with mosaic tile strip

  15. Install a new 18" vanity sink, faucet and drain, mirror and vanity light

  16. P-Trap, water lines and maybe new valves

  17. Install new toilet 2-piece 

  18. Install GFCI

  19. Install a corner shower curtain rod

  20. Paint Bathroom

  21. Install 5 1/4 baseboard. Paint the baseboard a high gloss white.

  22. Install mid grade lighting 

     

Bathroom Materials

Screen Shot 2021-09-07 at 6.01.38 PM.png

Bathroom Before Pictures

77ABFFCF-0B1D-4E53-BC2F-A70974DE2D28.jpg
596B9AA0-CE95-4D58-9B24-9C59E6B2D31D.jpg
C8C4219E-0FAB-4262-AF6F-44D8B1E52657.jpg
E24A89D6-113A-4C9C-975A-B131806C8314.jpg
bottom of page